NWL Transformers - Home Page
CALCULATING EFFICIENCIES OF POWER CONVERSION COMPONENTS & SYSTEMS
HOME | PRODUCTS | REPAIR & SERVICE | CONTACT US | WHY NWL? | MARKETS | RESOURCES |
  CLIENT LOGIN
 
 

A customer needed a dry resin potted AC voltage 60 Hz harmonic filter capacitor to complete an inverter design. They also needed a solution with military standards of reliability. NWL's solution was...
  READ MORE

Transformer Refurbishment Program

Complete Scope of Work

Major Components
 
  • Replace transformer coil
  • Replace current limiting reactor (if applicable)
  • Replace air core reactor(s)
  • Replace all resistors
  • Replace diode stacks (rectifier)
  • Replace meg resistor set
  • Replace low-voltage and high-voltage bushings
Tank Assembly
 
  • New gaskets
  • New pressure relief assembly
  • Tank overhaul
    • Clean and sandblast surface
    • Apply primer coat
    • Repaint in ASA 24 (blue) or ASA 61 (gray)
  • Refilled with new mineral or silicone oil (per customer requirements)
  • New drain valve assembly
  • New hazard identification labels and nameplate
  • Replace oil temperature gauge
  • Replace oil level gauge
  • Replace pressure/vacuum gauge
Wiring and other Accessories
 
  • Replace fuses and fuse block
  • Replace terminal block
  • Inspect switch band(s) and replace switch assembly (if necessary)
  • Replace surge arrestors
  • Replace wiring throughout unit
  • Replace all bulkhead connections and fittings

24 MONTH WARRANTY ON COMPLETE UNIT