NWL Transformers - Home Page
CALCULATING EFFICIENCIES OF POWER CONVERSION COMPONENTS & SYSTEMS
HOME | ABOUT US | PRODUCTS | MARKETS | SERVICE & SUPPORT | RESOURCES | CONTACT US |
  CLIENT LOGIN
 
 

A customer needed a dry resin potted AC voltage 60 Hz harmonic filter capacitor to complete an inverter design. They also needed a solution with military standards of reliability. NWL's solution was...
  READ MORE

APPLYING A NITROGEN BLANKET TO A T/R SET

PRINTABLE VERSION

Technical Bulletin # 208

APPLYING A NITROGEN BLANKET TO A T/R SET 

Tools Required:
                  -     Nitrogen Tank
                  -     Pressure Regulator with Gauge
                  -     1/4" Quick Coupler (QC) Valve Actuator
Procedure:
       
1.     Remove the protective cap from the 1/4" Quick Coupler Valve located on top of the T/R set. 
 
2.     Connect the hose from the regulator/gauge on the nitrogen tank to the 1/4" Quick Coupler Valve Actuator.
 
3.     Screw the Valve Actuator into the access valve on top of the T/R set.
 
4.     Pressurize the tank to 4 psig and let stand a couple of minutes. Close the valve on the top of the nitrogen tank and vent the T/R tank by pulling on the cap of the pressure relief valve.
 
5.     Repeat this pressurization and venting process 3 times.
 
6.     The T/R should be left with 0.5 psig pressure when completed.
 
7.     Remove the Quick Coupler Valve Actuator from the access valve on top of the T/R set and replace the protective cap.